Electric overhead lines

We have been actively involved with development projects in National Parks. Our tasks always include the preparation of preliminary and detailed feasibility studies as well as cost/benefit analyses. This work involves intensive professional consultations, site visits, terrain inspections and other hands-on activities to collect the required information. Dekut has participated in the following projects:

Electric overhead lines

Projects

Replacing the electric overhead lines in the BNPI area

Replacing the electric overhead lines with landlines at 4 segments of the Hevesi Füves Puszták and the Borsod Mezőség Nature Reserve.

Learn more

Replacing the electric overhead lines in the BNPI area

Replacing the 20kV power lines dangerous to birds with bird-friendly lines in the region of the Hevesi Füves Pusztál Protected Area

Insulating 407 km long power line in order to protect birds in the South-Heves Protected Area, replacing 3 km of overhead line with landline, insulating support posts along 18 km.

Learn more

Replacing the 20kV power lines dangerous to birds with bird-friendly lines in the region of the Hevesi Füves Pusztál Protected Area

Replacing the 20kV power lines dangerous to birds with bird-friendly lines in the protected area of South Borsod

Insulating the not yet insulated 240 km long power lines in order to make them bird-friendly in the Borsod Mezőség Protected Area and the Kesznyéten Protected Area.

Learn more

Replacing the 20kV power lines dangerous to birds with bird-friendly lines in the protected area of South Borsod